9/4 Tuesday main gear door work 5 hours
9/5 Wednesday main gear door work 4 hours
9/7 Friday main gear door handle 5 hours
9/8 Saturday main gear fit and fair 4 hours
9/10 Monday gear door hinges 7.5 hours
9/11 Tuesday gear door 6 hours
9/12 Wednesday vent work, door latch assembly 8 hours
9/15 Saturday hydraulic pump plumbing, latch work 8 hours
9/17 Monday flap work 8.5 hours
9/18 Tuesday canopy 2 hours
9/20 Thursday wood, 1/8" shims 2 hours
9/22 Friday install 1/8" shims 3 hours
9/23 Saturday hinge fixtures 2 hours
9/24 Monday speed brakes work 3.5 hours
9/25 Tuesday speed brakes work 3.5 hours
9/26 Wednesday center tanks 4.5 hours
9/30 Sunday center tanks, brakes work 3 hours

Click on any of the images below for a better view. The number under the image is the size of the better view in bytes followed by the date it was last edited and its name. Click on the name to view the jpeg header. Click back in your browser to return to this index or the parent of this archive has more images too.



168K Sep 28 2001 speedbrks.jpg

163K Sep 28 2001 3tank.jpg

201K Sep 18 2001 18rudder.jpg


222K Sep 18 2001 18gearpump.jpg

190K Sep 18 2001 18flapmotor.jpg

224K Sep 18 2001 18flaparm.jpg


143K Sep 18 2001 18doorlatch.jpg

154K Sep 13 2001 gearbottom.jpg

59K Sep 13 2001 transponder2.jpg


246K Sep 13 2001 stick.jpg

274K Sep 13 2001 pumptop.jpg

136K Sep 13 2001 pumpback.jpg


138K Sep 13 2001 locking.jpg

103K Sep 13 2001 handleright.jpg

121K Sep 13 2001 handleleft.jpg


79K Sep 13 2001 handle.jpg

313K Sep 13 2001 gear.jpg

238K Sep 13 2001 center.jpg


193K Sep 13 2001 alr.jpg

194K Sep 11 2001 OutDoor.jpg

89K Sep 11 2001 elevator.jpg


152K Sep 11 2001 DoorHing.jpg

49K Sep 5 2001 transponder.jpg

45K Sep 5 2001 com.jpg


134K Sep 5 2001 geardoor.jpg

110K Sep 3 2001 Airshow109.jpg

This 338 index.shtml was served for rob.com (207.170.160.160) via (none) on Monday, 19-Aug-2002 00:47:29 EDT using Wget/1.7 last edited by rob on Tuesday, 02-Oct-2001 09:39:42 EDT.